sales@triconcompressor.com Reply within 4 working hours
Worldwide delivery — Middle East · Africa · Central Asia · Latin America

How to Inspect Drilling Equipment Before Payment

Before payment and dispatch, buyers should verify the quoted model, serial plate, equipment condition, operating evidence, available test documents, included tooling, packing list and export documents. Tricon Air Power can coordinate inspection information for the specific equipment package and supplier arrangement. The exact inspection scope is confirmed in the quotation.

10 checksFrom serial plate to transport documents
Visible evidencePhotographs, plate, meter, documents
Scope per quotationConfirmed for the quoted equipment
Checklist

Drilling Equipment Inspection Checklist

Use the same list for a compressor, a drilling rig or a mixed tool package. On a combined order, every line item gets its own entry.

  1. Match the model and serial plate with the quotation.
  2. Confirm pressure, FAD, engine and configuration against the formal specification.
  3. Request actual-unit photos or a video walk-around when available.
  4. Check the hour meter and visible condition for used equipment.
  5. Review pressure and flow test documents when available.
  6. Confirm which hammers, bits, rods, casing, hoses and spare parts are included.
  7. Match crate numbers and packing-list line items.
  8. Confirm invoice, packing list, certificate of origin and transport documents.
  9. Confirm Incoterms, destination responsibilities and insurance scope.
  10. Record exceptions before loading and payment release.

Inspection confirms the quoted unit and the evidence available at the inspection stage. It is not a performance guarantee — see the FAQ below.

What Tricon coordinates

Inspection coordination

Tricon Air Power supplies and coordinates selected equipment. Inspection support is arranged for the specific package and supplier arrangement, and the exact scope is stated in the quotation.

  • Actual-unit photos and serial-plate information for the quoted unit.
  • Available pressure or flow test documents for the configuration quoted.
  • Packing-list verification against the crate and line items.
  • Third-party inspection arrangements where the supplier, location, timing and order terms allow.

Related pages: drilling compressors · DTH hammers and bits · Kazakhstan projects · delivery and documents.

FAQ

Frequently Asked Questions

Does inspection guarantee future site performance?

No. Inspection confirms the quoted unit and available evidence at the inspection stage. Actual site performance depends on configuration, operation, formation, altitude, temperature, maintenance and other field conditions.

Can a third-party inspector be arranged?

Third-party inspection may be arranged subject to the supplier, location, timing, scope and order terms.

Send the application — get a scoped quotation back

Hole diameter, depth, rock type, altitude and destination. One message is enough to start.

WhatsApp us Request a quote
WhatsApp