Delivery, packing & documents

All timings are planning estimates, not guaranteed delivery dates. Final timing depends on product availability, production, documentation, customs, border queues, route, weather and destination requirements. The quotation is the controlling document.

Heavy equipment does not travel like a parcel. This page shows the stages, the realistic times, the exit routes we use — road and sea, with the ports named per order — and the document set that travels with the machine.

15–25 dProduction (estimate)
7–12 dRoad transit (estimate)
Khorgos · AlashankouOverland crossings
Sea freightShanghai · Ningbo · Qingdao
Stage by stage

What actually takes the time

Quotations fail when “delivery time” means different things to buyer and seller. Below, each stage is separated — production, inland haul, customs, cross-border run — so you can plan a crew start date against it.

StageTypical planning estimateNotes
Production / build slot15–25 daysStandard configuration from stock can be shorter; cold-weather and high-altitude packages add build time.
Factory test & packing2–3 daysPressure and flow test, then export packing with loading photos sent to you before the truck leaves.
Works → exit port / crossing3–6 days roadOverland to Khorgos or Alashankou for Central Asia; to Shanghai, Ningbo or Qingdao when the order moves by sea. Full-truck-load; oversize units may need a low-bed trailer and a permit.
Export clearance1–3 daysDocuments prepared before the truck arrives at the border, not after.
Cross-border run to site4–8 daysKazakhstan, Uzbekistan, Kyrgyzstan. Weather and border queueing are the two variables we cannot control.
Realistic total to plan with30–45 days (estimate)From deposit to machine on site. Road transit alone is 7–12 days — production and border time sit either side of it.

Sea freight (FCL) from Shanghai, Ningbo or Qingdao serves the Gulf, Africa and Southeast Asia — transit depends on the port pair and is quoted per order. Rail (container or flat wagon) is 20–35 days transit (estimate) and usually cheaper for multi-unit orders. Air freight moves spare parts, not machines. All figures in this table are planning estimates, not guaranteed delivery dates: final timing depends on product availability, production, documentation, customs, border queues, route, weather and destination requirements. The quotation is the controlling document.

Packing

How a machine is prepared for the road

Compressor loaded on a flatbed at dusk
Loading at the works. Strapping points, axle load and trailer type are confirmed with the forwarder before the unit moves.
Export packing and transport of a portable compressor
Road configuration: unit on skid or chassis, hoses and adapters crated separately, spare-parts kit boxed and labelled.
Winter road transport route in Central Asia
Winter routing. Cold-weather packages are commissioned before loading, not on site in −20 °C.
ItemStandard
Machine protectionUnit on skid / chassis, exposed surfaces wrapped, control panel and gauges protected, hoses coiled and capped
Loose itemsSpare-parts kit, adapters and tools packed in a labelled crate — packing list item numbers match the crate labels
MoistureDesiccant and VCI film on request for sea or long rail routes
MarkingShipping marks with model, serial number and crate number on every package
PhotographsPacking and loading photos sent to the buyer before dispatch
Dispatch records

Works, warehouse and loading — what a shipment looks like

Below: the works floor where machines are staged and tested, the assembly line, a unit being moved out for dispatch, and an export project running overseas. Packing-list samples are issued with every quotation on request.

High pressure compressor moved by forklift at the works for dispatch
Dispatch at the works: a high-pressure portable unit staged for loading ahead of transport.
Assembly hall with drilling rigs lined up ready
Staging floor: completed rigs lined up and ready — stock visibility before you commit to a lead time.
Technicians assembling a drilling rig on the production line
Assembly line: engines, masts and tracks built up stage by stage, with inspection at each step.
Export project site — rig and compressor working overseas
Export project in service overseas — the same package, running far from the works.
Sample packing list document
Sample packing list (case numbers, weights and dimensions). The issued version carries real serial numbers and is sent with the quotation on request.
Documents

What travels with the shipment

Commercial and transport

Proforma invoice, commercial invoice, packing list, bill of lading or CMR, certificate of origin, export declaration copy.

Technical

Factory test report (pressure and flow), operation and maintenance manual, parts catalogue with part numbers, wiring diagram, cold-weather commissioning sheet where applicable.

Originals vs scans

Scans the day the truck crosses; originals by courier where the destination customs requires them.

Certification

Certificates as required by the destination market are confirmed case by case before the order is placed — ask early, some take longer than production.

Consolidation

One container, many suppliers — one party answerable for the lot

A drilling spread is rarely one factory. Compressor from one plant, rig from another, hammer and bits from a third, hoses and spares from a fourth. Buy each one direct and you collect four deposits, four export declarations and four arrival dates. We receive them at one address in Chengdu, check them together and load them in the order you will unload them on site.

LineWhere it comes fromShips from
Air compressorAtlas Copco China plants — Wuxi (compressors), Nanjing (construction & mining)Chengdu — or ex-works direct
Water-well and DTH rigXuanhua Jinke, XCMGChengdu
Hammer, bits, drill pipe, casingDrilling-tool plantsChengdu
Hoses, adapters, gauges, spare kitsAccessory plantsChengdu
Consumables — hammer oil, grease, wear partsMixedChengdu

Coordinated documents

We coordinate the available commercial, packing and transport documents for the quoted equipment package. The exact document set depends on the suppliers, shipment structure and destination requirements.

One inspection day

Every line is checked against the packing list at the same address before the container is sealed, and the photos reach you the same day.

One loading order

The container is packed in reverse of your unloading sequence, so the hammer, hoses and first-day spares come out first at site.

One commercial contact

One commercial contact coordinates the quoted equipment package, documentation and delivery updates. Responsibilities for each item are stated in the quotation; questions about items we do not manufacture are followed up with the supplier on your behalf.

Items we do not make are bought on your behalf and inspected at the same address. If a supplier's lead time slips, you hear it from us before the loading date — not from the port. Mixed loads (LCL) are possible for a small spread; once the spread fills a 40′ HC, a full container is the cheaper route.

Tell us the site and the start date — we will work backwards

Send the destination city and the date the crew must start, and we will return a schedule with the buffer shown.